Gratz Industries HQ: Playing in the Sand
>> Tuesday, August 7, 2007
The cement blocks were laid, the rain stayed away, and it was time to fill the rest of the foundation with sand. For that, they brought a new toy!
Not only did the foundation have to be filled, it had to be leveled. That came later though.
No sand for the patio - we're guessing it's going to be a step down from the main house. We had wanted a level floor from inside to outside, but the more we've been thinking about it the better it might be to keep an outdoor surface lower down to keep out any potential raining or flooding.
Next up - the plumbing is stubbed in!
0 comments:
Post a Comment